We offer very extensive erosion and drainage flooding solution. Our operation policy always entails the adequate and proper investigation of all data followed by the designing of the solution.
After this stage, proper model testing is carried out using the most modern computer design aids. This ensures that no variables are left to chance and as such, a proper working and tested model structure is created.
During construction, once again data is collected and collated continuously while our site engineers adhere very strictly to all designs provided. We also as a rule, subject all designs we are given by our clients to the same rigorous testing procedures. This is done with a view to ensuring proper and efficient operation of the structures with minimal level of maintenance.